Free Sample
Explain the methods and techniques used in civil engineering for earthworks and substructures
Solution.pdfHigher National Certificate/Diploma in
Construction and the Built Environment
The submission is in the form of a report. The report should be technical and written in a concise and formal business style. As such, your choice of font face and font size should contribute to the clarity of the information. The report should be well- structured, using headings, sub-sections and paragraphs as appropriate and should contain the sketch of the main scenario of the project as or if available or provided. Any images, graphics, or text that is derived from other sources must be correctly referenced using a standard form of citation. A bibliography should be included and in a standard academic format.
Your report should be 2500 words in length. While you will not be penalised for exceeding this word count by 10%, keep in mind that being clear and succinct are key features of professional documents.
Unit Learning Outcomes
O1 Explain the methods and techniques used in civil engineering for earthworks and substructures.
LO2 Present a safety plan risk assessment and method statement for a given civil engineering activity.
LO3 EvaluatLe a given civil engineering problem and propose a solution.
LO4 Prepare a design proposal for a new infrastructure project.
You have been asked to prepare a report that covers: key methods and techniques for earthworks and substructure activities; a safety plan with a risk assessment and method statements for a defined civil engineering activity; a civil engineering problem and its proposed solution; and a design proposal for a new infrastructure project.
The solution of the identified and clearly defined problem in civil engineering should be explored firstly, through considering different potential solutions’ options that may be available.
The construction and infrastructure project scenario provided below can be used as a Case study/Example for the whole scope of the work, or for the new work, the infrastructure project under consideration.
This assignment has four sections in line with the four learning outcomes covered by all tasks provided :
Scenario: (This is provided herein as a construction scenario covering all learning outcomes and may be utilised or applied to all stated tasks.)
SCENARIO
(Learners are to sketch the layout plan only of this practical Construction Project scenario and use and apply it where specified or needed as an example or case study especially in the consideration of specifications for construction materials, services and methods choices suggested)
You have been appointed to prepare an initial conceptual design and implementation report on an Industrial complex (1km by 1km) near a couple of near parallel expressway highways 12km apart that both link the megacity of London to an international airport in the outskirts of London, Heathrow to be specific. The site of this complex is separated from one of the express highways by a large fast flowing River that flows parallel to these highways and finally finds its way into the River Thames .This River which is about 20m wide lies in the middle (that is midway) of the 4 kilometre land space between the chosen Industrial complex site and one of the two expressways.
The Client who is a private investor needs ten (10) industrial building(s) and factories manufacturing baby foods, soaps, perfumes amongst several other commodities. This site is proposed together with some inter-connecting Infrastructure to the alternative highway on the other side of the site 6 km away, which is not only necessary but required as a key element of the project; the factories buildings are made of both steel, concrete and other materials (to be specified). These industry and factory buildings are provided as key structures of high specification that are intended to be built for the long term duration in this part of south of England, around the Heathrow Airport. The Industrial complex can be developed with steel or concrete or alternatives or a combination. The access interconnecting infrastructure roads to both highways can be flexible or rigid and the bridge across the stream and the walkway across the highways can be made of either RC concrete or steel, all in line with your choices for the project
LO1 Formulate a project that will provide a solution to an identified problem
TASK 1
-
Using the scenario provided, discuss the earthworks, equipment and techniques (b). For the scenario above or otherwise describe the methods that used to create complex foundations, piling works and drainage works. (c) . The scenario above is likely to include culverts and underpasses in the design of the complex infrastructure. Describe methods and techniques used in culvert and underpass construction including the provision for some utilities to be named.
-
Assuming that some of the structures such as office blocks in the industrial park in the scenario above has deep basements, analyse methods and techniques utilized in large and complex earth moving operations and deep excavations..
-
Evaluate methods and techniques used in dealing ground and slope stability for slopes found to be unstable in the vicinity of the industrial park area.
LO2 Manage a project within agreed timescales and specification, documenting the process throughout.
TASK 2
(a) For the construction options of the industrial park above, identify the hazards, risks and safety arrangements, working in confined spaces, working on structures including tall ones and for working within any temporary works that may be included in the interconnecting highways and local infrastructure.
(b) For the scenario above or otherwise, develop and present a safety plan, risk assessments and method statements for a given civil engineering activity to be identified.
(c) In general, discuss health and safety legislation and codes of practice related to civil engineering sites such as provided in the scenario above.
(d) Justify a site safety plan, risk assessments and method statements report for identified activities related to the scenario project above.
LO3 Evaluate potential Project Management Solutions
(a)Explore and evaluate the environmental, quality, geotechnical and economic contests of a civil engineering problem to be chosen amongst several identified problems to be identified and propose and explore a viable solution to this problem, justifying the selection of specific engineering features in the development of the solution.
(b) Develop a proposal that states how the environmental, geotechnical, quality and economic contexts of the problem identified in (a) are addressed.
LO4 Produce a project report and deliver a presentation of the final project outcome
Task 4
(a)With the scenario above describe methods and techniques used in highway design and develop a proposal for the new infrastructure access for the project.
(b) Using the scenario above , analyse methods and techniques used to create bridge foundations and flexible highway construction foundations stating the key criteria needed, including key geotechnical parameters to be identified.
Learning Outcomes and Assessment Criteria
LO1 Explain the common methods and techniques used in civil engineering earthworks and substructures
M1 Analyse methods and D1 Evaluate methods techniques used in large and techniques used to complex earthmoving deal with issues of operations and deep ground and slope excavations.
stability.
P1 Discuss earthworks activities, equipment and techniques. P2 Describe methods and techniques used to create complex foundations, piling works and drainage works. P3 Describe methods and techniques used in culvert construction, underpass construction and provision for utilities.
LO2 Present a site safety plan, risk assessment and method statement for a given civil engineering activity P4 Identify the hazards, risks M2 Discuss health & and safety arrangements for safety legislation and excavations, working in codes of practice related confined spaces, working on to civil engineering sites. structures and for working within temporary works on highways. P5 Develop and present a site safety plan, risk assessments and method statements for a given civil engineering activity.
D2 Justify a site safety plan, risk assessments and method statements report for activities related to a
given civil engineering project.
Pass
Merit
Distinction
LO3 Evaluate a given civil engineering problem and propose a solution P6 Evaluate the
M3 Illustrate how the environmental, quality, environmental, geotechnical and economic | geotechnical, quality and contexts of a given civil economic contexts of a engineering problem.
problem are addressed P7 Propose a solution to a
through a proposal. given civil engineering problem. LO4 Prepare a design proposal for a new infrastructure project
LO3 L04 D3 Justify the selection of specific features in the development of a civil engineering solution to a given problem.
P8 Describe methods and techniques used in highway design. P9 Develop a civil engineering design proposal for a new infrastructure project.
M4 Analyse methods and techniques used to create bridge foundations, flexible highway construction foundation criteria and related geotechnical parameters.Tired of the boring assignments to be submitted to colleges and universities? MyAssignmentMart.com gives you multiple reasons to trust it with your orders. We employ PhD experts handpicked from prestigious universities over the globe. We cater to quality assignment help, dissertation writing services and online essay help, covering more than 100 academic subjects. We pledge to complete your assignments on time and never compromise when it comes to deadline. Our prices for assignments are the most competitive in the market and make sure the cost suits your budget.

Get Assignment Help Now...!
Subjects We Offer
- Engineering Assignment Help
- MATLAB Assignment Help
- Mechanical Engineering Assignment Help
- Civil Engineering Assignment Help
- Computer Science Assignment Help
- Electrical Engineering Assignment Help
- Electronics Assignment Help
- Economics Assignment Help
- Management Assignment Help
- Do My Assignment
- Cheap Assignment Help
- Programming Assignment Help
- Law Assignment Help
- Assignment Provider
- Finance Assignment Help
- Python Assignment help
- Healthcare Management Assignment Help
- Computer Network Assignment Help
- History Assignment Help
- Industrial Engineering Homework Help
- IT Management Assignment Help
- Nursing Assignment Help
- Operating System Assignment Help
- Statistics Assignment Help
- Material Science Assignment Help
- Mechanical Engineering Homework Help
- University Assignment Help
- Agriculture Engineering Homework Help
- ATHE Courses Assignment Help
- Capital Budgeting Assignment Help
- BTEC Assignment Help
- HND Assignment Help
- Material Science Assignment Help
- Psychology Assignment Help
- Resit Assignment Help
- Computer Architecture Assignment Help
- Data Structure Assignment Help
- Database Assignment Help
- PHP Assignment Help